Categories: Uncategorized

Machine downtime – 3 causes fixed in 2 weeks

Plan for reducing 3 big machine downtimes caused by work ethics issues

In a lot of shops, just machine downtime at shift changes and extended break times can account for up to 1.5 hours in each 8-hour shift, which is an astounding 18 % of available time. If you also have night time sleeping, you can easily hit 30 % downtime because of poor work ethics. Production tracking with an Industry 4.0 based system can easily put a stop to this. All these machine downtimes reduce to almost zero in just 2 weeks after installing the system.

1. Reduced machine downtime at shift changes

If you work 3 shifts of 8 hours each, and the operator starts production 30 minutes late stops 30 minutes in every shift, you lose 3 hours every day. That’s 13 % of the available capacity.

2. Reduced machine downtime at breaks

Just extending breaks by 15 minutes in each shift can cause of downtime of 3%. That’s a capacity reduction of 3%.

3. Machine downtime in night shift

There are firms where there is zero production in the second half of the night shift. The operators are presumably sleeping, because there were no supervisors in the night shift. This means the machines are idle 18 % of the time out of a possible 22 working hours.                                                                                                                                                                                                  Misuse of Feedrate Override, to compensate for machine downtime

Feedrate override misuse is typically done to accelerate parts production to make up for downtime cause by other work ethics issues. This can result in reduced tool life and poor parts quality because of poor surface finish in finishing operations.

What’s the solution ? Leanworx has reports that shows all these 4 issues. Just  print the reports every day for all machines and put them up on the shop floor notice board. So everyone knows who the slackers are. The problems just vanish automatically. No talking to people, no nasty conversations.

All machine downtimes caused by work ethics issues, between 10 and 30 % of the total available time, reduce to zero in just 2 weeks.

Dasarathi G V

Director in LEANworx. Industry 4.0 machine monitoring. Scale OEE & Profits, reduce CapEx.

Recent Posts

How to reduce overtime in manufacturing using leanworx

How do I work 2 shifts instead of 3, and do the same production ? If you are working 3…

4 days ago

Industrial Machine Monitoring system- 5 Minute Explanation

An industrial machine monitoring system is designed to  do these:Capture data from machines.Transfer the data to a computer that has…

1 month ago

How to NOT implement a production monitoring systems in 2024

Production monitoring systems involve these basic components:Hardware and software that collects data electronically from the machine, and stores it in…

1 month ago

Can Machine Monitoring Software Improve Work Ethics?

Downtime due to work ethics issues can account for a surprisingly large amount of downtime.Late starting and early stoppage in…

1 month ago

Is manufacturing monitoring system useless in SMEs ? [ Misconception Explained]

A manufacturing monitoring system in SMEs yields big benefits in profits.It is very affordable.It pays back for itself in 1…

1 month ago

How Machine Downtime Tracking Software Stopped Night Shifts

LEANworx  machine downtime tracking software enabled a firm to stop working in the night shift.With the help of Leanworx, they…

1 month ago